Plot B logic Leeds - Phi Group & Keller Together!

Phi Group have recently completed the installation of gabion cladding as facing to a soil nailed slope, constructed by our colleagues at Keller. The project at Logic Leeds, is a prestigious development of various warehouses and industrial units. Plot B works are being carried out by Bowmer and Kirkland Ltd, who were sold on the idea of one geotechnical contractor carrying out the complete package for the soil nailing and facing system. Keller installed over 6,000m of soil nails, with Phi Group installing 1,200 square metres of gabion cladding. A great example of collaboration and also the wide range of solutions that Keller can provide.

 

Sitemap
×