Phi Group are delighted to have commenced on site for Balfour Beatty at their A2 Bean and Ebbsfleet Junction Improvements project for Highways England.
Early collaboration between Phi Group, Balfour Beatty and the scheme designer Atkins really paid dividends, with the detailed design period commencing in June 2020. In total Phi Group undertook the detailed design of three of their CE Marked Andacrib concrete crib retaining walls, assisting Atkins with preparation of the AIPs. The retaining walls are up to 8.0m maximum height, with the first wall we are installing being situated around an existing pylon, retaining up to 7.0m in height. All design is carried out in house, with installation expertly completed by our directly employed teams, providing our clients the the complete solution. Keep checking back for regular updates from this exciting project.